How to assign your team members to a cost center (department)

To assign a team member to a specific Cost Center, follow these steps

  1. Navigate side bar menu: People → Team then select the Team Member you want to assign to a Cost CenterTM_CC_1.png
  2. Click on Position tab, then click on edit 🖊️
    TM_CC_2.png
  3. Select the Cost center to be assigned and click Save
    TM_CC_3.png
  4. The TM will be assigned a cost center
    TM_CC_4.png

Also see:

Was this article helpful?

0 out of 1 found this helpful