What is Days to Cure?

This is the number of days that a problem (breach) can be corrected before termination.

Once the non breaching side has provided a written notice of the breach, the other side will have this number of days to correct the problem.

If the problem is not corrected, the non breaching side may immediately terminate the contract, without having to provide the full notice period.